Project Experiences & Successes
Search by Blog Tags
- Asset Integrity 18
- Blockage Remediation 5
- BlueFin 7
- CAPEX 4
- Chemical Systems 6
- Cold Cutting 1
- Commissioning 48
- Controlled Bolting 5
- Decarbonization 1
- Downstream 4
- Drilling 1
- Engineering 20
- Field Machining 1
- Filtration 1
- Flow Assurance 15
- Frac & Stimulation 1
- GATE Energy 14
- GATE Prho 5
- Hydrostatic Pressure Testing 14
- Industrial Field Services 9
- Integrity Management 13
- LiquiGel® 8
- Materials Corrosion and Integrity Support 4
- Midstream 2
- OPEX 23
- Oil & Gas 86
- Onshore Pipeline 2
- Onshore Production 5
- Operations Readiness 3
- PME 14
- Pipeline Cleaning 25
- Pipeline Decommissioning 5
- Pipeline Field Services 36
- Pneumatic Leak Testing 5
- Process Facilities 10
- Project Facilities 43
- QA-TPI 1
- Refinery & Plant 9
- SafeHeat 1
- Specialty Field Services 7
- Subsea 14
- Subsurface 13
- Topsides 3
- Upstream 20
- Viking Lab 1
- Water Injection 8
- Water Treatment & Filtration 2
- Well Engineering 16
- eelReel 8
Old Floatcell Removed via Cold Cutting & Bull Rigging
A client was removing the existing vessel to replace with a smaller and more efficient vessel. BlueFin was called to make four (4) cold cuts at different locations on the vessel for ease of removal. The vessel was located beneath an overhead deck, and about eighty (80) feet away from the handrail, which didn’t allow for crane access.
Caribbean LNG Operator Calls For Connection Integrity Management Verification
An operator of a Liquified Natural Gas (LNG) offshore loading facility required mechanical torque value verification on multiple structural assemblies in order to abide by the manufacturer’s recommended specifications and standards.
LNG Operator Demands Integrated Industrial Solutions For Plant StartUp
An operator of an onshore Liquefied Natural Gas (LNG) micro fuel facility sought integrated solutions from a single source contractor. Ongoing activities with multiple construction groups were working compressed schedules in order to ready the facility for a re-purposed product. Direct technical commissioning support became an value target during the early phase of project execution, as pressure testing and torque value verification for 600+ connection joints demanded specific expertise.
Barge Pre-Commissioning
Integrated mechanical and pipeline services provide bundled solutions for independent GoM operator.
Desired End-Preparation
Split frame lathe technology delivers field machining solutions for one Supermajor in the Dragon Field block.
Gas Storage
A large North American midstream company operating a gas storage facility required connection integrity management for a planned casing reroute. Due to damaged casing as a result of salt fall within the cavern, the said operator required a large Snubbing stack installation to handle the cavern pressure and capable of cutting 10 3/4” casing.
Deepwater Flowline Dewater/Dry with High Pressure Nitrogen
An established operator in the Gulf of Mexico, through their preferred contractor, requested BlueFin to perform the dewatering of the flowlines for their two new tiebacks to an existing deepwater facility.
Pneumatic Pressure Test On Air Cooled Condenser (ACC) System
BlueFin Model A manifold systems are designed for high pressure, multiple line flushing and pressure testing.
Permian Operator Receives Integrated Expertise For Gathering System Commissioning
Planning and project management across a single source provide bundled solutions that deliver cost effective and schedule sensitive services for three separate Central Gathering Facilities (CGF’s) on an expedited timeline for first oil.