Project Experiences & Successes
Search by Blog Tags
- Asset Integrity 18
- Blockage Remediation 5
- BlueFin 7
- CAPEX 4
- Chemical Systems 6
- Cold Cutting 1
- Commissioning 48
- Controlled Bolting 5
- Decarbonization 1
- Downstream 4
- Drilling 1
- Engineering 20
- Field Machining 1
- Filtration 1
- Flow Assurance 15
- Frac & Stimulation 1
- GATE Energy 14
- GATE Prho 5
- Hydrostatic Pressure Testing 14
- Industrial Field Services 9
- Integrity Management 13
- LiquiGel® 8
- Materials Corrosion and Integrity Support 4
- Midstream 2
- OPEX 23
- Oil & Gas 86
- Onshore Pipeline 2
- Onshore Production 5
- Operations Readiness 3
- PME 14
- Pipeline Cleaning 25
- Pipeline Decommissioning 5
- Pipeline Field Services 36
- Pneumatic Leak Testing 5
- Process Facilities 10
- Project Facilities 43
- QA-TPI 1
- Refinery & Plant 9
- SafeHeat 1
- Specialty Field Services 7
- Subsea 14
- Subsurface 13
- Topsides 3
- Upstream 20
- Viking Lab 1
- Water Injection 8
- Water Treatment & Filtration 2
- Well Engineering 16
- eelReel 8
Inspection Of Mill Certificates
During the fabrication of the subsea boarding valve skid for a major offshore platform in the Gulf of Mexico, the fabricator purchased several large forgings. These large forgings, from 8” to 12” in diameter, were to be machined into block valve bodies rated to 15,000 psig. As part of the agreed-upon Inspection and Test Plan, the mill certificates for the forgings were reviewed by the fabricator and by the company inspector.