GATE Energy Case Study GATE Energy GATE Energy Case Study GATE Energy

Mobile Modular Ammonia Demonstration Unit – FEL 2A (Select Phase)

GATE Energy was engaged to execute FEL 2A (Select Phase) for a first-of-its-kind mobile modular ammonia demonstration unit designed to produce 5 metric tons per day (TPD). The unit was required to be fully containerized within two standard 40-foot ISO shipping containers and transportable across multiple European sites, operating approximately six months per location before relocation. 

Read More