Project Experiences & Successes
BHP Billiton - Shenzi Waterflood Commissioning
GATE was involved early in the seawater treating design basis to influence / impart operability and commissioning efforts. From the design phase, GATE became responsible for dynamic commissioning and start-up during the offshore phase.
Remaining Life Assessment Of Subsea Jumpers, Flowlines & Risers
GATE was engaged to evaluate the current condition and remaining life of the subsea jumpers and flowline of a deepwater oil and gas facility in the Gulf of Mexico.
The subsea field, which was comprised of multiple oil wells, was produced at a Tension Leg Platform (TLP) with a nominal capacity to produce 100,000 barrels of oil and 50 million cubic feet of gas per day. The subsea and topsides facilities were designed to operate with an expected maximum carbon dioxide (CO2) concentration of 0.15 mole percent from any given producing well.