BlueFin Case Study GATE Energy BlueFin Case Study GATE Energy

Gas Storage

A large North American midstream company operating a gas storage facility required connection integrity management for a planned casing reroute. Due to damaged casing as a result of salt fall within the cavern, the said operator required a large Snubbing stack installation to handle the cavern pressure and capable of cutting 10 3/4” casing.

Read More