Case Study GATE Energy Case Study GATE Energy

Old Floatcell Removed via Cold Cutting & Bull Rigging

A client was removing the existing vessel to replace with a smaller and more efficient vessel. BlueFin was called to make four (4) cold cuts at different locations on the vessel for ease of removal. The vessel was located beneath an overhead deck, and about eighty (80) feet away from the handrail, which didn’t allow for crane access.

Read More
Case Study GATE Energy Case Study GATE Energy

LNG Operator Demands Integrated Industrial Solutions For Plant StartUp

An operator of an onshore Liquefied Natural Gas (LNG) micro fuel facility sought integrated solutions from a single source contractor. Ongoing activities with multiple construction groups were working compressed schedules in order to ready the facility for a re-purposed product. Direct technical commissioning support became an value target during the early phase of project execution, as pressure testing and torque value verification for 600+ connection joints demanded specific expertise.

Read More
Case Study GATE Energy Case Study GATE Energy

Gas Storage

A large North American midstream company operating a gas storage facility required connection integrity management for a planned casing reroute. Due to damaged casing as a result of salt fall within the cavern, the said operator required a large Snubbing stack installation to handle the cavern pressure and capable of cutting 10 3/4” casing.

Read More